Schedules are deferred in the MVP
The reduced adapter-backed rollout does not include the legacy schedule surface yet.
This surface is intentionally deferred in the reduced MVP while the adapter-backed migration is being stabilized.
What is available right now
- • Live channels and category browsing remain available.
- • Reduced channel pages keep core identity and follow/unfollow.
- • Schedule-specific queries will come back after the core MVP path is stable.